Preventive maintenance optimization for excitation system of bhumibol hydro power plant
Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002- 2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system...
Saved in:
Main Authors: | Pansrisu S., Premrudeepreechacharn S. |
---|---|
Format: | Conference Proceeding |
Published: |
2017
|
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=78649602805&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/43155 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Similar Items
-
Preventive maintenance optimization for excitation system of bhumibol hydro power plant
by: S. Pansrisu, et al.
Published: (2018) -
Age estimation of electrographite brush in generator system for optimized maintenance planning of Sirikit hydro power plant
by: Kate-Singnoy,W., et al.
Published: (2015) -
Frequency Control of Electricity Grid Integrated with Variable Generation Using Pumped Storage Hydro Power Plant
by: Subin Netsawang, et al.
Published: (2020) -
Development of expert system for fault diagnosis of an 8-MW bulb turbine downstream irrigation hydro power plant
by: Isara Buaphan, et al.
Published: (2018) -
Development of expert system for fault diagnosis of an 8-MW bulb turbine downstream irrigation hydro power plant
by: Isara Buaphan, et al.
Published: (2018)