Methods of improving the lightning performance of 22 kV circuit underbuilt on 115 kV transmission lines
This paper presents the analysis of lightning overvoltages of 22 kV. overhead distribution line underbuilt on 115 kV. transmission line circuit to investigate the options for increasing the lightning performance. Improvement efforts could include better grounding, higher critical flashover voltage (...
Saved in:
Main Author: | Thanaphong Thanasaksiri |
---|---|
Format: | Conference Proceeding |
Published: |
2018
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=33847218311&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/61657 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Similar Items
-
Studies of lightning overvoltages of 115 kV CMU GIS substation
by: T. Thanasaksiri
Published: (2018) -
Studies of lightning overvoltages of 115 kV CMU GIS substation
by: Thanasaksiri T.
Published: (2017) -
Comparative studies of lightning performance of a quadruple-circuit dual voltage 275/732kV transmission line design with wooden crossarms
by: Liew, A.C., et al.
Published: (2014) -
Insulation level and clearances for 230 kV air insulated substation
by: Thanasaksiri,T.
Published: (2015) -
Insulation level and clearances for 230 kV air insulated substation
by: Thanasaksiri T.
Published: (2014)