Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I

This paper proposes an integrated maintenance scheduling and production planning algorithms for generator maintenance scheduling of a hydro power system. Hydro power station characteristics and constraints are taken into account in maintenance scheduling problem. The studied power system exchanges p...

Full description

Saved in:
Bibliographic Details
Main Authors: P. Netibanedith, W. Rattanachuen, W. Tayati
Format: Conference Proceeding
Published: 2018
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=33847217970&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/61662
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-61662
record_format dspace
spelling th-cmuir.6653943832-616622018-09-11T08:56:41Z Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I P. Netibanedith W. Rattanachuen W. Tayati Engineering This paper proposes an integrated maintenance scheduling and production planning algorithms for generator maintenance scheduling of a hydro power system. Hydro power station characteristics and constraints are taken into account in maintenance scheduling problem. The studied power system exchanges power with the neighboring country. The objective of this method is to optimize water value or revenue of the hydro power system with standard reliability constraints. The maximum and minimum reservoir operating curves are first determined from hydrology statistics. Then the limited energy of each sub-period is calculated. After that the three step searching is used to find the maximum revenue maintenance schedule. The water value is evaluated according to import and export tariffs. The maximum and minimum reservoir operating curves, the general maintenance constraints and the minimum reliability level are taken into consideration. Based on the proposed method, a computer program is developed and tested with a case study, an existing Electricite Du Laos (EDL) Region I hydro power system. The results confirm the proposed method a better maintenance schedules compared with the maintenance schedule employed by EDL. The system revenue increase of up to 20% is achieved while the reliability is still with in EDL standard. 2018-09-11T08:56:41Z 2018-09-11T08:56:41Z 2006-12-01 Conference Proceeding 2-s2.0-33847217970 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=33847217970&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/61662
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
topic Engineering
spellingShingle Engineering
P. Netibanedith
W. Rattanachuen
W. Tayati
Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I
description This paper proposes an integrated maintenance scheduling and production planning algorithms for generator maintenance scheduling of a hydro power system. Hydro power station characteristics and constraints are taken into account in maintenance scheduling problem. The studied power system exchanges power with the neighboring country. The objective of this method is to optimize water value or revenue of the hydro power system with standard reliability constraints. The maximum and minimum reservoir operating curves are first determined from hydrology statistics. Then the limited energy of each sub-period is calculated. After that the three step searching is used to find the maximum revenue maintenance schedule. The water value is evaluated according to import and export tariffs. The maximum and minimum reservoir operating curves, the general maintenance constraints and the minimum reliability level are taken into consideration. Based on the proposed method, a computer program is developed and tested with a case study, an existing Electricite Du Laos (EDL) Region I hydro power system. The results confirm the proposed method a better maintenance schedules compared with the maintenance schedule employed by EDL. The system revenue increase of up to 20% is achieved while the reliability is still with in EDL standard.
format Conference Proceeding
author P. Netibanedith
W. Rattanachuen
W. Tayati
author_facet P. Netibanedith
W. Rattanachuen
W. Tayati
author_sort P. Netibanedith
title Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I
title_short Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I
title_full Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I
title_fullStr Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I
title_full_unstemmed Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I
title_sort maintenance scheduling of generating units in a hydro power system: a case study of edl region i
publishDate 2018
url https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=33847217970&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/61662
_version_ 1681425662406033408