Maintenance scheduling of generating units in a hydro power system: A case study of EDL region I
This paper proposes an integrated maintenance scheduling and production planning algorithms for generator maintenance scheduling of a hydro power system. Hydro power station characteristics and constraints are taken into account in maintenance scheduling problem. The studied power system exchanges p...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Proceeding |
Published: |
2018
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=33847217970&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/61662 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Be the first to leave a comment!