Quantitative Risk Assessment for Main Equipment in Acid Gas Removal and Dehydration Unit (Case Study: Train I Tangguh LNG Plan)
Risk assessment has to be done with consideration of some aspects such as operation, material, environment, financial, operator, etc in purpose to prevent failures or damages within the system. These damages can affect seriously to safety caused by blasting or toxic leakage, and also financial losse...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/10079 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |