Quantitative Risk Assessment for Main Equipment in Acid Gas Removal and Dehydration Unit (Case Study: Train I Tangguh LNG Plan)
Risk assessment has to be done with consideration of some aspects such as operation, material, environment, financial, operator, etc in purpose to prevent failures or damages within the system. These damages can affect seriously to safety caused by blasting or toxic leakage, and also financial losse...
Saved in:
Main Author: | TEJO (NIM 13104017), BASKORO |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/10079 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SEMI-QUANTITATIVE RISK ASSESSMENT FOR CO2 REMOVAL UNIT ARUN LNG PLANT
by: ADHI NUGROHO (NIM : 13104134); Pembimbing : Prof. Dr. Ir. IGN Wiratmaja Puja, OKTAFIANTO -
Quantitative Risk Assessment for Equipments in Gas Processing Unit at The Topside of Offshore Platform
by: HADYANSYAH (NIM13103104), REZA -
The More People Come, The Harder Lives Become: Migration to the Villages around the LNG Tangguh Project, Papua
by: Setiadi, Setiadi, et al.
Published: (2024) -
Modeling and simulation of main cryogenic heat exchanger in an Lng plant
by: Hasan, M.M.F., et al.
Published: (2014) -
KAJIAN PERKEMBANGAN
MASYARAKAT KAMPUNG TANAH MERAH
PASCA PEMUKIMAN KEMBALI
PROYEK BP-LNG TANGGUH
DI KABUPATEN TELUK BINTUNI
by: , RONALD AMPULEMBANG, et al.
Published: (2011)