Quantitative Risk Assessment for Main Equipment in Acid Gas Removal and Dehydration Unit (Case Study: Train I Tangguh LNG Plan)

Risk assessment has to be done with consideration of some aspects such as operation, material, environment, financial, operator, etc in purpose to prevent failures or damages within the system. These damages can affect seriously to safety caused by blasting or toxic leakage, and also financial losse...

Full description

Saved in:
Bibliographic Details
Main Author: TEJO (NIM 13104017), BASKORO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/10079
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first