#TITLE_ALTERNATIVE#
<p align="justify">PT. XYZ , Tbk is going to build Captive Power Plant (CPP) in one of their factory in Narogong Bogor. In order to build the CPP, the power system in PT. XYZ needs to be reviewed in ten years time. This study focused on evaluation of the installed electrical apparat...
Saved in:
Main Author: | PRATOMOSIWI (NIM 13203059), FARI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/10412 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
APPLICATION OF RTV SILICONE RUBBER COATING FOR IMPROVING PERFORMANCE OF CERAMIC OUTDOOR INSULATOR UNDER POLLUTED CONDITION
by: PRATOMOSIWI (NIM: 23207005), FARI -
#TITLE_ALTERNATIVE#
by: Chandra Kriswanto (NIM 15002010 ) ; Eka Susanto NIM 15002010 (NIM 15002095), Aqri -
#TITLE_ALTERNATIVE#
by: (NIM:15002152) ; Rizal Kurniadi ( NIM:15002147), William -
#TITLE_ALTERNATIVE#
by: Wahyudi (NIM 15003070), Tandika Marcel (NIM 15303050), Seto -
#TITLE_ALTERNATIVE#
by: Christian (NIM : 15002071) ; Rizki Kushardani (NIM : 15002084)., Wildan