#TITLE_ALTERNATIVE#

<p align="justify">PT. XYZ , Tbk is going to build Captive Power Plant (CPP) in one of their factory in Narogong Bogor. In order to build the CPP, the power system in PT. XYZ needs to be reviewed in ten years time. This study focused on evaluation of the installed electrical apparat...

Full description

Saved in:
Bibliographic Details
Main Author: PRATOMOSIWI (NIM 13203059), FARI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/10412
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first