HUMAN RESOURCES LEVELING FOR STEAM POWER PLANT OPERATION ENGINEER PATH USING P3JJ PATTERN

Steam Power Plant that used coal as its fuel is a complex system or consist of many parts. All equipments and supporting tools must be well handled in order to create an optimal operation at the plant. Human resources play an important role in all equipments and supporting tools handling. Therefore,...

Full description

Saved in:
Bibliographic Details
Main Author: HAJAM MASKUR , M.
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/10883
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Steam Power Plant that used coal as its fuel is a complex system or consist of many parts. All equipments and supporting tools must be well handled in order to create an optimal operation at the plant. Human resources play an important role in all equipments and supporting tools handling. Therefore, human resources management is needed to build personals with appropriate competence and can handle all existing works.<p>One of the management type that able to be used by the company is Profesi dengan 3 Jalur ber-Jenjang (P3JJ) pattern. According to P3JJ pattern, competence can built by elaborating work element and type. Science, technology, and knowledge understanding which needed in works handling will become base in personals competence planning. Hence, knowledge based personals will be formed.<p>A human competence planning based on P3JJ pattern will enable an effective and efficient works handling. In addition, company's core competence will be formed. Company's core competence will become stock in company development in the future.