HUMAN RESOURCES LEVELING FOR STEAM POWER PLANT OPERATION ENGINEER PATH USING P3JJ PATTERN
Steam Power Plant that used coal as its fuel is a complex system or consist of many parts. All equipments and supporting tools must be well handled in order to create an optimal operation at the plant. Human resources play an important role in all equipments and supporting tools handling. Therefore,...
Saved in:
Main Author: | HAJAM MASKUR , M. |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/10883 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF OPERATOR TRAINING SIMULATOR FOR STEAM DRUM LEVEL CONTROL IN STEAM POWER PLANT USING DISTRIBUTED CONTROL SYSTEM
by: ( NIM : 13313058, Bellinda -
DESIGN OF OPERATOR TRAINING SIMULATOR FOR STEAM DRUM LEVEL CONTROL IN STEAM POWER PLANT USING DISTRIBUTED CONTROL SYSTEM
by: Khasanah (NIM : 13313064), Uswatun -
Spreadsheet For Heat Balance Calculation of Steam Power Plant (Case Study : Gresik Steam Power Plant)
by: Kurniawan Purba, Ridho -
Spreadsheet For Heat Balance Calculation of Steam Power Plant (Case Study : Gresik Steam Power Plant)
by: Kurniawan Purba, Ridho -
REVERSE ENGINEERING SUDU FORCE DRAFT FAN STEAM POWER PLANT 315 MW OF CAPACITY
by: Abdurrohim, Arif