SIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir)

Before planned as reservoir, RRD (Re-Regulating Dam) function as regulated dam which location not far from Susup village. Dam function was to control flow which would be released to downstream with maximum flow 62 m3/s (210 MW). With that capacities, Musi hydropower generation just operated with max...

Full description

Saved in:
Bibliographic Details
Main Author: NOVERSA (NIM: 95007001), HENDRA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12190
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12190
spelling id-itb.:121902017-09-27T15:23:36ZSIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir) NOVERSA (NIM: 95007001), HENDRA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12190 Before planned as reservoir, RRD (Re-Regulating Dam) function as regulated dam which location not far from Susup village. Dam function was to control flow which would be released to downstream with maximum flow 62 m3/s (210 MW). With that capacities, Musi hydropower generation just operated with maximum load during 6 hour in condition at RRD flow 15,5 m3/s. Operation hour Musi hydropower could be longer when aperture in RRD more than 15,5 m3/s. But this thing could not be done because limitation capacities of simpang aur lemau river.<p>In this study hydropower generation RRD Susup is reservoir which will be proposed built at simpang aur river which located at susup village, sub province of North Bengkulu. By planned RRD as reservoir was expected become solution to maximize Musi hydropower operation according to preliminary design, and become new source energy that is RRD Susup hydropower generation which give benefit to society. This hydropower generation built with reservoir inflow are stochastic monthly flow from upstream simpang aur river and determenistic monthly flow which from turbine outflow Musi hydropower generation. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Before planned as reservoir, RRD (Re-Regulating Dam) function as regulated dam which location not far from Susup village. Dam function was to control flow which would be released to downstream with maximum flow 62 m3/s (210 MW). With that capacities, Musi hydropower generation just operated with maximum load during 6 hour in condition at RRD flow 15,5 m3/s. Operation hour Musi hydropower could be longer when aperture in RRD more than 15,5 m3/s. But this thing could not be done because limitation capacities of simpang aur lemau river.<p>In this study hydropower generation RRD Susup is reservoir which will be proposed built at simpang aur river which located at susup village, sub province of North Bengkulu. By planned RRD as reservoir was expected become solution to maximize Musi hydropower operation according to preliminary design, and become new source energy that is RRD Susup hydropower generation which give benefit to society. This hydropower generation built with reservoir inflow are stochastic monthly flow from upstream simpang aur river and determenistic monthly flow which from turbine outflow Musi hydropower generation. <br />
format Theses
author NOVERSA (NIM: 95007001), HENDRA
spellingShingle NOVERSA (NIM: 95007001), HENDRA
SIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir)
author_facet NOVERSA (NIM: 95007001), HENDRA
author_sort NOVERSA (NIM: 95007001), HENDRA
title SIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir)
title_short SIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir)
title_full SIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir)
title_fullStr SIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir)
title_full_unstemmed SIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir)
title_sort simulation operation for single reservoir system using synthetic flows result modelling of stochastic hydrology (case study development of re-regulating dam to hydropower generation reservoir)
url https://digilib.itb.ac.id/gdl/view/12190
_version_ 1820728444393095168