SIMULATION OPERATION FOR SINGLE RESERVOIR SYSTEM USING SYNTHETIC FLOWS RESULT MODELLING OF STOCHASTIC HYDROLOGY (Case Study Development Of Re-Regulating Dam To Hydropower Generation Reservoir)
Before planned as reservoir, RRD (Re-Regulating Dam) function as regulated dam which location not far from Susup village. Dam function was to control flow which would be released to downstream with maximum flow 62 m3/s (210 MW). With that capacities, Musi hydropower generation just operated with max...
Saved in:
Main Author: | NOVERSA (NIM: 95007001), HENDRA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12190 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Hydrologic analysis for the modification of four earth dams and reservoirs in Hawaii
by: Palisoc, Marlon Bryan R.
Published: (2016) -
Optimal hedging policies for hydropower generation at ubolratana reservoir
by: Areeya Rittima
Published: (2018) -
Feasibility study of an underground reservoir with an integrated pumped-storage hydropower system (discharge consideration)
by: Huang, Shijie
Published: (2017) -
Optimal reservoir operation in Sermo Reservoir for irrigation water utilization
by: , KO, Wai Yan, et al.
Published: (2009) -
Greenhouse Gas Development of Equations for Estimating Greenhouse Gas Emisions from the Son La Hydropower Reservoir
by: Nguyen, Thi The Nguyen, et al.
Published: (2017)