#TITLE_ALTERNATIVE#
The occur of failures around Push Back Seven South (PB7S) for the last 4 quarter in 2007 required more attention for this area. In addition, PB7S is an area which planned for production since 2008. Therefore, stable bench will be needed to prevent failure bench that bring about interference either t...
Saved in:
Main Author: | P. H. S. (NIM 12104073), HUALA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12219 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: H. Soemartono -NIM : 28195009, -
#TITLE_ALTERNATIVE#
by: H. (NIM 28100088), FACHRUDDIN -
#TITLE_ALTERNATIVE#
by: H. S. (NIM 13503128), REINHARD -
#TITLE_ALTERNATIVE#
by: P. M. (NIM 20506019), MAURITZ -
#TITLE_ALTERNATIVE#
by: P. RITONGA (NIM 12203017), BONA