#TITLE_ALTERNATIVE#

The occur of failures around Push Back Seven South (PB7S) for the last 4 quarter in 2007 required more attention for this area. In addition, PB7S is an area which planned for production since 2008. Therefore, stable bench will be needed to prevent failure bench that bring about interference either t...

Full description

Saved in:
Bibliographic Details
Main Author: P. H. S. (NIM 12104073), HUALA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12219
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first