#TITLE_ALTERNATIVE#

Production cost calculation can be done in several ways, such as using probabilistic method. Calculation using probabilistic methode differ from deterministic methode which is all of generation unit need to be operated in probabilistic methode due to random forced outage generation unit. The calcula...

Full description

Saved in:
Bibliographic Details
Main Author: KAMAL (NIM 13204246), MUSTAPA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12444
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12444
spelling id-itb.:124442017-09-27T10:18:36Z#TITLE_ALTERNATIVE# KAMAL (NIM 13204246), MUSTAPA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12444 Production cost calculation can be done in several ways, such as using probabilistic method. Calculation using probabilistic methode differ from deterministic methode which is all of generation unit need to be operated in probabilistic methode due to random forced outage generation unit. The calculation is started by determining load level. Probability load level calculate from their duration in system. Cumulatif distribution function can be calculate from Probability load level. Probability production cost calculation uses unserve load method. This method is done by using convolution between Cumulatif distribution function and availability factor of each generation unit according to economic dispatch. This convolution produce new unserved load which have smaller value. Generated energy of each generation unit is difference before and after generation unit operated. Total generation cost is addition variable and fixed cost. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Production cost calculation can be done in several ways, such as using probabilistic method. Calculation using probabilistic methode differ from deterministic methode which is all of generation unit need to be operated in probabilistic methode due to random forced outage generation unit. The calculation is started by determining load level. Probability load level calculate from their duration in system. Cumulatif distribution function can be calculate from Probability load level. Probability production cost calculation uses unserve load method. This method is done by using convolution between Cumulatif distribution function and availability factor of each generation unit according to economic dispatch. This convolution produce new unserved load which have smaller value. Generated energy of each generation unit is difference before and after generation unit operated. Total generation cost is addition variable and fixed cost.
format Final Project
author KAMAL (NIM 13204246), MUSTAPA
spellingShingle KAMAL (NIM 13204246), MUSTAPA
#TITLE_ALTERNATIVE#
author_facet KAMAL (NIM 13204246), MUSTAPA
author_sort KAMAL (NIM 13204246), MUSTAPA
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/12444
_version_ 1820728521399468032