#TITLE_ALTERNATIVE#
Production cost calculation can be done in several ways, such as using probabilistic method. Calculation using probabilistic methode differ from deterministic methode which is all of generation unit need to be operated in probabilistic methode due to random forced outage generation unit. The calcula...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12444 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:12444 |
---|---|
spelling |
id-itb.:124442017-09-27T10:18:36Z#TITLE_ALTERNATIVE# KAMAL (NIM 13204246), MUSTAPA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12444 Production cost calculation can be done in several ways, such as using probabilistic method. Calculation using probabilistic methode differ from deterministic methode which is all of generation unit need to be operated in probabilistic methode due to random forced outage generation unit. The calculation is started by determining load level. Probability load level calculate from their duration in system. Cumulatif distribution function can be calculate from Probability load level. Probability production cost calculation uses unserve load method. This method is done by using convolution between Cumulatif distribution function and availability factor of each generation unit according to economic dispatch. This convolution produce new unserved load which have smaller value. Generated energy of each generation unit is difference before and after generation unit operated. Total generation cost is addition variable and fixed cost. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Production cost calculation can be done in several ways, such as using probabilistic method. Calculation using probabilistic methode differ from deterministic methode which is all of generation unit need to be operated in probabilistic methode due to random forced outage generation unit. The calculation is started by determining load level. Probability load level calculate from their duration in system. Cumulatif distribution function can be calculate from Probability load level. Probability production cost calculation uses unserve load method. This method is done by using convolution between Cumulatif distribution function and availability factor of each generation unit according to economic dispatch. This convolution produce new unserved load which have smaller value. Generated energy of each generation unit is difference before and after generation unit operated. Total generation cost is addition variable and fixed cost. |
format |
Final Project |
author |
KAMAL (NIM 13204246), MUSTAPA |
spellingShingle |
KAMAL (NIM 13204246), MUSTAPA #TITLE_ALTERNATIVE# |
author_facet |
KAMAL (NIM 13204246), MUSTAPA |
author_sort |
KAMAL (NIM 13204246), MUSTAPA |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/12444 |
_version_ |
1820728521399468032 |