#TITLE_ALTERNATIVE#
Production cost calculation can be done in several ways, such as using probabilistic method. Calculation using probabilistic methode differ from deterministic methode which is all of generation unit need to be operated in probabilistic methode due to random forced outage generation unit. The calcula...
Saved in:
Main Author: | KAMAL (NIM 13204246), MUSTAPA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12444 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: REZA PRATAMA KAMAL (NIM 13702007), MUHAMMAD -
#TITLE_ALTERNATIVE#
by: Chandra Kriswanto (NIM 15002010 ) ; Eka Susanto NIM 15002010 (NIM 15002095), Aqri -
#TITLE_ALTERNATIVE#
by: (NIM:15002152) ; Rizal Kurniadi ( NIM:15002147), William -
#TITLE_ALTERNATIVE#
by: Wahyudi (NIM 15003070), Tandika Marcel (NIM 15303050), Seto -
#TITLE_ALTERNATIVE#
by: Christian (NIM : 15002071) ; Rizki Kushardani (NIM : 15002084)., Wildan