#TITLE_ALTERNATIVE#
Production cost calculation can be done in several ways, such as using probabilistic method. Calculation using probabilistic methode differ from deterministic methode which is all of generation unit need to be operated in probabilistic methode due to random forced outage generation unit. The calcula...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12444 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |