#TITLE_ALTERNATIVE#

Grasberg block cave underground mining will be started in 2016. As a primary access for man and material, AB Tunnel has been building since 2004 using drill and blast tunneling method. With primary sequences are 1) Drilling face, 2) charging and blasting, 3) mucking and hauling, 4) ground supporting...

Full description

Saved in:
Bibliographic Details
Main Author: HABIBIE (NIM 12104017), RIZKI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12593
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia