#TITLE_ALTERNATIVE#
Grasberg block cave underground mining will be started in 2016. As a primary access for man and material, AB Tunnel has been building since 2004 using drill and blast tunneling method. With primary sequences are 1) Drilling face, 2) charging and blasting, 3) mucking and hauling, 4) ground supporting...
Saved in:
Main Author: | HABIBIE (NIM 12104017), RIZKI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12593 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: RIZKI (NIM 29105333), LUKMAN -
#TITLE_ALTERNATIVE#
by: AFTARIANTO (NIM 13204018), RIZKI -
#TITLE_ALTERNATIVE#
by: EKANANDA (NIM 10503024), RIZKI -
#TITLE_ALTERNATIVE#
by: WICAKSONO (NIM : 13204034), RIZKI -
#TITLE_ALTERNATIVE#
by: RIZKI ANGGIA (NIM 13204157), MUHAMMAD