DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT
The construction of Paiton Units 3 and Paiton Baru steam power plant that located far from the center of the load & still have limitation on capacity EHV transmission network have predicted reduce the capacity factor Paiton Unit 1&2 in future. Therefore necessary to impact the development of...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12802 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The construction of Paiton Units 3 and Paiton Baru steam power plant that located far from the center of the load & still have limitation on capacity EHV transmission network have predicted reduce the capacity factor Paiton Unit 1&2 in future. Therefore necessary to impact the development of operations & revenue Paiton units 1&2 and the search for alternative solutions to compensate for the decrease in revenue happened.<p>The writer do operations analysis & financial using projection data from the energy allocation of Energy Management Department. In order to formulate strategies Paiton Unit 1 & 2 deal with the presence of new competitors in the same region, the authors use the TOWS matrix and compare several alternative solutions generated. Then using the performance criteria include: contribution benefits, the additional revenue, the risk of failure, implementation effort and the payback period, the author will choose the best option based on weight produced the highest rating. <br />
|
---|