DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT

The construction of Paiton Units 3 and Paiton Baru steam power plant that located far from the center of the load & still have limitation on capacity EHV transmission network have predicted reduce the capacity factor Paiton Unit 1&2 in future. Therefore necessary to impact the development of...

Full description

Saved in:
Bibliographic Details
Main Author: BHAGASKARA (NIM: 23207329), YUDHY
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12802
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12802
spelling id-itb.:128022017-09-27T15:37:39ZDOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT BHAGASKARA (NIM: 23207329), YUDHY Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12802 The construction of Paiton Units 3 and Paiton Baru steam power plant that located far from the center of the load & still have limitation on capacity EHV transmission network have predicted reduce the capacity factor Paiton Unit 1&2 in future. Therefore necessary to impact the development of operations & revenue Paiton units 1&2 and the search for alternative solutions to compensate for the decrease in revenue happened.<p>The writer do operations analysis & financial using projection data from the energy allocation of Energy Management Department. In order to formulate strategies Paiton Unit 1 & 2 deal with the presence of new competitors in the same region, the authors use the TOWS matrix and compare several alternative solutions generated. Then using the performance criteria include: contribution benefits, the additional revenue, the risk of failure, implementation effort and the payback period, the author will choose the best option based on weight produced the highest rating. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The construction of Paiton Units 3 and Paiton Baru steam power plant that located far from the center of the load & still have limitation on capacity EHV transmission network have predicted reduce the capacity factor Paiton Unit 1&2 in future. Therefore necessary to impact the development of operations & revenue Paiton units 1&2 and the search for alternative solutions to compensate for the decrease in revenue happened.<p>The writer do operations analysis & financial using projection data from the energy allocation of Energy Management Department. In order to formulate strategies Paiton Unit 1 & 2 deal with the presence of new competitors in the same region, the authors use the TOWS matrix and compare several alternative solutions generated. Then using the performance criteria include: contribution benefits, the additional revenue, the risk of failure, implementation effort and the payback period, the author will choose the best option based on weight produced the highest rating. <br />
format Theses
author BHAGASKARA (NIM: 23207329), YUDHY
spellingShingle BHAGASKARA (NIM: 23207329), YUDHY
DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT
author_facet BHAGASKARA (NIM: 23207329), YUDHY
author_sort BHAGASKARA (NIM: 23207329), YUDHY
title DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT
title_short DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT
title_full DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT
title_fullStr DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT
title_full_unstemmed DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT
title_sort downtime optimization of paiton 1&2 steam power plant after the construction of paiton 3 & paiton baru steam power plant
url https://digilib.itb.ac.id/gdl/view/12802
_version_ 1820728627973586944