DOWNTIME OPTIMIZATION OF PAITON 1&2 STEAM POWER PLANT AFTER THE CONSTRUCTION OF PAITON 3 & PAITON BARU STEAM POWER PLANT
The construction of Paiton Units 3 and Paiton Baru steam power plant that located far from the center of the load & still have limitation on capacity EHV transmission network have predicted reduce the capacity factor Paiton Unit 1&2 in future. Therefore necessary to impact the development of...
Saved in:
Main Author: | BHAGASKARA (NIM: 23207329), YUDHY |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12802 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Damage Cost of Paiton Coal Steam Power Plant Unit 1 and Unit 2
by: IGNATIUS RIDO DESANDA (NIM 23207330), VODEGEL, -
Risk Analysis of Old Control System Disturbance for Determining Power Plant Control System Retrofit Policy Alternative Using Monte Carlo Simulation (Case Study of Paiton Power Plant)
by: DARMA NUGROHO (NIM 23207337), ANDRIE -
EFISIENSI PEMBANGKIT LISTRIK: STUDI KASUS UNIT PEMBANGKITAN PAITON
by: LAILIA RAHMAWATI, 041411131111
Published: (2018) -
“PENGARUH SAFETY CLIMATE TERHADAP SAFETY BEHAVIOR DENGAN INDIVIDUAL DIFFERENCE SEBAGAI VARIABEL INTERVENING PADA KARYAWAN PT. PAITON OPERATION AND MAINTENANCE INDONESIA. PAITON,
JAWA TIMUR”
by: WAHYU ANANG TRI A, 041211232142
Published: (2017) -
PELIBATAN MASYARAKAT DALAM PROGRAM CORPORATE SOCIAL RESPONSIBILTY PADA PROGRAM DEWI HARMONI OLEH PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKITAN PAITON (PT PJB UP PAITON)
by: Yanu Arif Budiman, 071411531060
Published: (2019)