#TITLE_ALTERNATIVE#
Value of m is one factor to estimate reserves. Estimation value of m using only logging data isn't sure approaching a real value, especially for shaly sand layer which need many corrections. Addition of well's production data can give more information which could predict better value of m,...
Saved in:
Main Author: | DERRY WIRAWAN (NIM 12206024); Pembimbing: Ir. Hernansjah, ALVIN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13239 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: ONGIRIWALU (NIM 12205027); Pembimbing: Ir. Hernansjah, GARRY -
#TITLE_ALTERNATIVE#
by: AS SYUKRI (NIM 12205034); Pembimbing: Ir. Hernansjah, HERRU -
#TITLE_ALTERNATIVE#
by: MAHENDRA (NIM 12206050); Pembimbing: Ir. Hernansjah, BRAVO -
#TITLE_ALTERNATIVE#
by: RIZKIAWAN (NIM 12205041); Pembimbing: Ir. Hernansjah, WISNU -
#TITLE_ALTERNATIVE#
by: WIRAWAN (NIM : 13706011): Dosen Pembimbing : Dr. Bambang Widyanto, SIGIT