#TITLE_ALTERNATIVE#
Oil field X has been producing for over 25 years. Currently, this field produces 197350 BFPD with more than 95% of water cut. Typically, it is complicated for an old oil field to increase its oil rates due to highly cost in conducting enhanced oil recovery (EOR) and its low possibility of success. T...
Saved in:
Main Author: | ANWAR (NIM 12204066); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., KHAIRUL |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13600 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
#TITLE_ALTERNATIVE#
by: PRAWESTI (NIM 12205066); Pembimbing: Dr. Ir. Leksono Mucharam, M.Sc., ANNISA
by: PRAWESTI (NIM 12205066); Pembimbing: Dr. Ir. Leksono Mucharam, M.Sc., ANNISA
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 22206003); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., AZZALZALAH -
#TITLE_ALTERNATIVE#
by: (NIM 12206078); Pembimbing: Ir. Leksono Mucharam, M.Sc., Ph.D., ANDRIANTO -
#TITLE_ALTERNATIVE#
by: PARDOMUAN (NIM 12206088); Pembimbing: Ir. Leksono Mucharam, M.Sc., Ph.D., EKASIH -
#TITLE_ALTERNATIVE#
by: SINA (NIM 12204065); Pembimbing: Ir. Leksono Mucharam, M.Sc., Ph.D., IBNU -
#TITLE_ALTERNATIVE#
by: BACHTIAR (NIM 12205047); Pembimbing: Ir. Leksono Mucharam M.Sc. Ph.D., DEDE