Gas field X has been producing since August 1990 and this field is considered as a giant wet gas field with potential reserve Inital gas in place is around 15 TCF (trillion cubic feet). One of the main problems of this field is the productivity of several wells bothered by the obstacles in pipe tran...

Full description

Saved in:
Bibliographic Details
Main Author: NOVIANSYAH (NIM 12203038); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., MUHAMAD
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13671
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:13671
spelling id-itb.:136712017-09-27T10:37:31Z#TITLE_ALTERNATIVE# NOVIANSYAH (NIM 12203038); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., MUHAMAD Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/13671 Gas field X has been producing since August 1990 and this field is considered as a giant wet gas field with potential reserve Inital gas in place is around 15 TCF (trillion cubic feet). One of the main problems of this field is the productivity of several wells bothered by the obstacles in pipe transmission or what we called bottlenecking.<p>Bottlenecking caused high pressure drop on certain pipe segment that unites two or more pipes behind, so it looks like the flow narrowed and the giving high backpressure to the wellhead. To solve this, a model has to be made to intimate the field conditions. From run the model, we could identify which segment has high pressure drop, then we fix it by two methods, first by changing the pipe inside diameter with the optimum one and the second by installing parallel pipe next to the bottlenecked pipe. We, then, calculate the economical aspect for each solution, for determining the best method of these two approaches. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Gas field X has been producing since August 1990 and this field is considered as a giant wet gas field with potential reserve Inital gas in place is around 15 TCF (trillion cubic feet). One of the main problems of this field is the productivity of several wells bothered by the obstacles in pipe transmission or what we called bottlenecking.<p>Bottlenecking caused high pressure drop on certain pipe segment that unites two or more pipes behind, so it looks like the flow narrowed and the giving high backpressure to the wellhead. To solve this, a model has to be made to intimate the field conditions. From run the model, we could identify which segment has high pressure drop, then we fix it by two methods, first by changing the pipe inside diameter with the optimum one and the second by installing parallel pipe next to the bottlenecked pipe. We, then, calculate the economical aspect for each solution, for determining the best method of these two approaches.
format Final Project
author NOVIANSYAH (NIM 12203038); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., MUHAMAD
spellingShingle NOVIANSYAH (NIM 12203038); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., MUHAMAD
#TITLE_ALTERNATIVE#
author_facet NOVIANSYAH (NIM 12203038); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., MUHAMAD
author_sort NOVIANSYAH (NIM 12203038); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., MUHAMAD
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/13671
_version_ 1820736254897029120