#TITLE_ALTERNATIVE#
Gas field X has been producing since August 1990 and this field is considered as a giant wet gas field with potential reserve Inital gas in place is around 15 TCF (trillion cubic feet). One of the main problems of this field is the productivity of several wells bothered by the obstacles in pipe tran...
Saved in:
Main Author: | NOVIANSYAH (NIM 12203038); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., MUHAMAD |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13671 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 22206003); Pembimbing : Ir. Leksono Mucharam, M.Sc., Ph.D., AZZALZALAH -
#TITLE_ALTERNATIVE#
by: (NIM 12206078); Pembimbing: Ir. Leksono Mucharam, M.Sc., Ph.D., ANDRIANTO -
#TITLE_ALTERNATIVE#
by: PARDOMUAN (NIM 12206088); Pembimbing: Ir. Leksono Mucharam, M.Sc., Ph.D., EKASIH -
#TITLE_ALTERNATIVE#
by: SINA (NIM 12204065); Pembimbing: Ir. Leksono Mucharam, M.Sc., Ph.D., IBNU -
#TITLE_ALTERNATIVE#
by: BACHTIAR (NIM 12205047); Pembimbing: Ir. Leksono Mucharam M.Sc. Ph.D., DEDE