#TITLE_ALTERNATIVE#
Coal mining activity at PT Bukit Makmur jobsite Sebuku is designed based on open pit mining system. PT. XYZ as the site owner set a fuel ratio target between fuel consumption of the vehicle that used in the waste mining process from pit (loading area) to disposal area at 0,83 L/bcm annually. But the...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13831 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |