#TITLE_ALTERNATIVE#

Coal mining activity at PT Bukit Makmur jobsite Sebuku is designed based on open pit mining system. PT. XYZ as the site owner set a fuel ratio target between fuel consumption of the vehicle that used in the waste mining process from pit (loading area) to disposal area at 0,83 L/bcm annually. But the...

Full description

Saved in:
Bibliographic Details
Main Author: HEYDER WINARTO (NIM 12104093); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc., SATRIA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13831
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items