#TITLE_ALTERNATIVE#
Coal mining activity at PT Bukit Makmur jobsite Sebuku is designed based on open pit mining system. PT. XYZ as the site owner set a fuel ratio target between fuel consumption of the vehicle that used in the waste mining process from pit (loading area) to disposal area at 0,83 L/bcm annually. But the...
Saved in:
Main Author: | HEYDER WINARTO (NIM 12104093); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc., SATRIA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13831 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
#TITLE_ALTERNATIVE#
by: SIMBOLON (NIM 12204055); Pembimbing: Dr. Ir. Leksono Mucharam, M.Sc., JUNIUS
by: SIMBOLON (NIM 12204055); Pembimbing: Dr. Ir. Leksono Mucharam, M.Sc., JUNIUS
Similar Items
-
#TITLE_ALTERNATIVE#
by: PETRUS S. (NIM 12102023); Pembimbing: Dr. Ir. Suseno Kramadibrata, M.Sc., EDWARD -
#TITLE_ALTERNATIVE#
by: PANGARIBUAN (NIM 12103016); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc., MARTIN -
#TITLE_ALTERNATIVE#
by: BUDI SUSILO (NIM : 12105040); Pembimbing : Dr. Ir. Suseno Kramadibrata, DJOKO -
#TITLE_ALTERNATIVE#
by: TAUFIQ KRAMADIBRATA (NIM 12203022), ARI -
#TITLE_ALTERNATIVE#
by: (NIM: 231 03 016); Pembimbing : Dr. Ir. Taufiq Rochim , SUSENO