Increasing of electric demand on the system will cause a system reconfiguration and it will change the reliability level at each substation. To get the optimal reliability level, we must spend the investation to build up generators and transmission lines. The final project deals with a mechanism of...

全面介紹

Saved in:
書目詳細資料
主要作者: ABDUL MATIN (NIM 13205160); Pembimbing: Dr. Ir. Muhammad Nurdin dan Ir.Nanang Haryanto, MT., TOTOH
格式: Final Project
語言:Indonesia
在線閱讀:https://digilib.itb.ac.id/gdl/view/13875
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia