#TITLE_ALTERNATIVE#
Increasing of electric demand on the system will cause a system reconfiguration and it will change the reliability level at each substation. To get the optimal reliability level, we must spend the investation to build up generators and transmission lines. The final project deals with a mechanism of...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13875 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!