#TITLE_ALTERNATIVE#
Increasing of electric demand on the system will cause a system reconfiguration and it will change the reliability level at each substation. To get the optimal reliability level, we must spend the investation to build up generators and transmission lines. The final project deals with a mechanism of...
Saved in:
Main Author: | ABDUL MATIN (NIM 13205160); Pembimbing: Dr. Ir. Muhammad Nurdin dan Ir.Nanang Haryanto, MT., TOTOH |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13875 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: FADHLI (NIM 13205097); Pembimbing: Dr. Ir. Muhammad Nurdin dan Dr.Ir.Nanang Haryanto, MT., FUAD -
#TITLE_ALTERNATIVE#
by: SEPTAVYN (NIM : 13205124); Pembimbing : Dr. Ir. Muhammad Nurdin ; Dr.Ir.Nanang Haryanto, MT., ROBIN -
#TITLE_ALTERNATIVE#
by: ARDIYANTO (NIM : 13205189); Pembimbing : Dr.Ir. Muhammad Nurdin; Dr. Ir. Nanang Haryanto, TRI -
#TITLE_ALTERNATIVE#
by: MAHAGA PUTRA (NIM 13205129); Pembimbing : Dr.Ir. Muhammad Nurdin dan Dr.Ir. Nanang Haryanto, M., ANDI -
#TITLE_ALTERNATIVE#
by: RIZKI WARDANA (NIM : 13205178); Pembimbing : Dr.Ir. Muhammad Nurdin; Dr.Ir. Nanang Haryanto, FELA