#TITLE_ALTERNATIVE#
On March 9, 2009 at a daily online media (Republika) have been reported of landslides under the Cipada Bridge. In order to determine the impact of landslides on the bridge construction, required a continous deformation monitoring activities. Preliminary study used in preparation and planning deforma...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14421 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | On March 9, 2009 at a daily online media (Republika) have been reported of landslides under the Cipada Bridge. In order to determine the impact of landslides on the bridge construction, required a continous deformation monitoring activities. Preliminary study used in preparation and planning deformation monitoring of bridges by terrestrial. The study was conducted by collecting information of soil characteristics and bridge, determination of the bridge segment, planning framework, and identification of the target point on the bridge. The result of this research is a documentation of the bridge object that has an indication of the deformation, the shape of the target point on the bridge segment, and location of framework for the measurement. |
---|