#TITLE_ALTERNATIVE#

On March 9, 2009 at a daily online media (Republika) have been reported of landslides under the Cipada Bridge. In order to determine the impact of landslides on the bridge construction, required a continous deformation monitoring activities. Preliminary study used in preparation and planning deforma...

Full description

Saved in:
Bibliographic Details
Main Author: OKTAVIAN (NIM 15107063); Pembimbing: Dr. Ir. S. Hendriatiningsih, MT dan Dr. Andri Hernandi, S, RENDI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14421
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14421
spelling id-itb.:144212017-10-09T10:51:08Z#TITLE_ALTERNATIVE# OKTAVIAN (NIM 15107063); Pembimbing: Dr. Ir. S. Hendriatiningsih, MT dan Dr. Andri Hernandi, S, RENDI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14421 On March 9, 2009 at a daily online media (Republika) have been reported of landslides under the Cipada Bridge. In order to determine the impact of landslides on the bridge construction, required a continous deformation monitoring activities. Preliminary study used in preparation and planning deformation monitoring of bridges by terrestrial. The study was conducted by collecting information of soil characteristics and bridge, determination of the bridge segment, planning framework, and identification of the target point on the bridge. The result of this research is a documentation of the bridge object that has an indication of the deformation, the shape of the target point on the bridge segment, and location of framework for the measurement. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description On March 9, 2009 at a daily online media (Republika) have been reported of landslides under the Cipada Bridge. In order to determine the impact of landslides on the bridge construction, required a continous deformation monitoring activities. Preliminary study used in preparation and planning deformation monitoring of bridges by terrestrial. The study was conducted by collecting information of soil characteristics and bridge, determination of the bridge segment, planning framework, and identification of the target point on the bridge. The result of this research is a documentation of the bridge object that has an indication of the deformation, the shape of the target point on the bridge segment, and location of framework for the measurement.
format Final Project
author OKTAVIAN (NIM 15107063); Pembimbing: Dr. Ir. S. Hendriatiningsih, MT dan Dr. Andri Hernandi, S, RENDI
spellingShingle OKTAVIAN (NIM 15107063); Pembimbing: Dr. Ir. S. Hendriatiningsih, MT dan Dr. Andri Hernandi, S, RENDI
#TITLE_ALTERNATIVE#
author_facet OKTAVIAN (NIM 15107063); Pembimbing: Dr. Ir. S. Hendriatiningsih, MT dan Dr. Andri Hernandi, S, RENDI
author_sort OKTAVIAN (NIM 15107063); Pembimbing: Dr. Ir. S. Hendriatiningsih, MT dan Dr. Andri Hernandi, S, RENDI
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/14421
_version_ 1820737211872575488