#TITLE_ALTERNATIVE#
On March 9, 2009 at a daily online media (Republika) have been reported of landslides under the Cipada Bridge. In order to determine the impact of landslides on the bridge construction, required a continous deformation monitoring activities. Preliminary study used in preparation and planning deforma...
Saved in:
Main Author: | OKTAVIAN (NIM 15107063); Pembimbing: Dr. Ir. S. Hendriatiningsih, MT dan Dr. Andri Hernandi, S, RENDI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14421 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: FAUZIAH (NIM. 15106035); Pembimbing: r.S.Hendriatiningsih, Ir.,M.S. dan Dr. Andri Hernandi,I, CHUSNUL -
#TITLE_ALTERNATIVE#
by: HARBIMAHARANI (NIM 15105029); Pembimbing: Eka Djunarsjah, Dr., Ir., M.T., dan Andri Hernandi, , HANNI -
#TITLE_ALTERNATIVE#
by: DERIYANTO (NIM 15105065); Pembimbing: Eka Djunarsjah, Dr., Ir., M.T., dan Andri Hernandi, Dr, BAMBANG -
#TITLE_ALTERNATIVE#
by: (NIM 15105054); Pembimbing: Dr. Ir. Eka Djunarsjah, MT. dan Dr. Ir. Andri Hernandi, MSP., DILVO -
#TITLE_ALTERNATIVE#
by: NOVE ADWAS (NIM 15107024); Pembimbing: Dr. Andri Hernandi, ST, MT, dan Dr. Ir. S. Hendriatin, MIROLAS