FLOW RATE OPTIMIZATION OF AMINE HP PUMP P-310 IN CO2 REMOVAL SYSTEM AT PABELOKAN GAS PLANT OWNED BY CNOOC SES LTD.

Flow rate optimization of Amine HP Pump P-310 in Amine Train Unit I (CO2 Removal system) has been done in this final project to reduce power consumption in P-310 system. CO2 Removal system is simulated on HYSYS by using tray modeled Amine Contactor. <br /> <br /> <br /> Pabelokan...

Full description

Saved in:
Bibliographic Details
Main Author: WIJAYA SUDIRGO (NIM : 13107145); Pembimbing Utama : Ir.Arianto Santoso,M.Sc., AARON
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14585
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first