FLOW RATE OPTIMIZATION OF AMINE HP PUMP P-310 IN CO2 REMOVAL SYSTEM AT PABELOKAN GAS PLANT OWNED BY CNOOC SES LTD.
Flow rate optimization of Amine HP Pump P-310 in Amine Train Unit I (CO2 Removal system) has been done in this final project to reduce power consumption in P-310 system. CO2 Removal system is simulated on HYSYS by using tray modeled Amine Contactor. <br /> <br /> <br /> Pabelokan...
Saved in:
Main Author: | WIJAYA SUDIRGO (NIM : 13107145); Pembimbing Utama : Ir.Arianto Santoso,M.Sc., AARON |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14585 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Perubahan strategi manajemen budaya keselamatan kinerja di CNOOC SES Ltd. guna menunjang keunggulan kompetitif
by: , SUHARYADI, et al.
Published: (2008) -
Faktor-faktor yang mempengaruhi kepuasan pengguna (User satisfaction) dalam implementasi sistem ERP di CNOOC SES LTD
by: , WIDODO, Soni, et al.
Published: (2010) -
UPAYA OPTIMASI SISTEM PENGADAAN BARANG PERAWATAN UNTUK FASILITAS PRODUKSI DI DEPARTEMEN POWER, GAS, AND FACILITIES CNOOC SES LTD
by: , Subhan Alfajri, et al.
Published: (2013) -
UPAYA OPTIMASI SISTEM PENGADAAN BARANG PERAWATAN UNTUK FASILITAS PRODUKSI DI DEPARTEMEN POWER, GAS, AND FACILITIES CNOOC SES LTD
by: , Subhan Alfajri, et al.
Published: (2013) -
Evaluasi manajemen pemeliharaan fasilitas lapanagn produksi minyak lepas pantai :: Studi kasus CNOOC SES Ltd. Unit Bisnis Utama
by: , ARIMURTI, Handoko, et al.
Published: (2010)