DESIGN OF PIPING SYSTEM IN CLUSTER 24 LAHENDONG UNIT IV GEOTHERMAL PRODUCTION FACILITY
Geothermal has been utilized as one of alternative energy source in Indonesia since 1983. Until 2008, Indonesia has utilized 1052 MW from total potential 27140 MWe of geothermal energy source. Utilization of geothermal <br /> <br /> <br /> energy could be optimized by construc...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/15181 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |