DESIGN OF PIPING SYSTEM IN CLUSTER 24 LAHENDONG UNIT IV GEOTHERMAL PRODUCTION FACILITY
Geothermal has been utilized as one of alternative energy source in Indonesia since 1983. Until 2008, Indonesia has utilized 1052 MW from total potential 27140 MWe of geothermal energy source. Utilization of geothermal <br /> <br /> <br /> energy could be optimized by construc...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/15181 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |
成為第一個發表評論!