DESIGN OF PIPING SYSTEM IN CLUSTER 24 LAHENDONG UNIT IV GEOTHERMAL PRODUCTION FACILITY

Geothermal has been utilized as one of alternative energy source in Indonesia since 1983. Until 2008, Indonesia has utilized 1052 MW from total potential 27140 MWe of geothermal energy source. Utilization of geothermal <br /> <br /> <br /> energy could be optimized by construc...

全面介紹

Saved in:
書目詳細資料
主要作者: JOVAN VIVALDIZ , BOB
格式: Final Project
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/15181
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Institut Teknologi Bandung
語言: Indonesia