DESIGN OF PIPING SYSTEM IN CLUSTER 24 LAHENDONG UNIT IV GEOTHERMAL PRODUCTION FACILITY
Geothermal has been utilized as one of alternative energy source in Indonesia since 1983. Until 2008, Indonesia has utilized 1052 MW from total potential 27140 MWe of geothermal energy source. Utilization of geothermal <br /> <br /> <br /> energy could be optimized by construc...
Saved in:
Main Author: | JOVAN VIVALDIZ , BOB |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/15181 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
by: BHAKTI ARIFMAN , ANDY -
PENGEMBANGAN SIMULATOR DINAMIK TIPE GENERIK SISTEM GENERATOR UAP PLTU UNTUK ALAT BANTU PELATIHAN OPERATOR (STUDI KASUS : SISTEM GENERATOR UAP PLTU SURALAYA UNIT I, H, III, DAN IV)
by: Choliq, Moch. -
PASSENGER CAR UNIT VALUES AND SATURATION FLOWS FOR JUNCTIONS IN BANDUNG
by: Djohar, Hartoni -
DEVELOPMENT OF PROCESS KINETICS MODEL, HYDRODYNAMICS OF DISSOLVED AIR FLOTATION UNIT, AND CONCEPT OF MICRO-BUBBLE GENERATOR
by: BUDIANTO , HERY -
PENGARUH PENGAKU BAJA TERHADAP PERILAKU STRUKTUR PORTAL BETON BERTULANG
by: Adrian, Feddy