FMEA IMPLEMENTING OF PLTGU BEKASI POWER̉̉S STEAM TURBINE MAINTENANCE
Final project is about making FMEA form of steam turbine <br /> <br /> <br /> PLTGU Bekasi Power in order to know the Risk Priority Number in which explain the priority of maintenance task. Traditional maintenance only focus on time based maintenance, it doesn’t care the cause...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/16690 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:16690 |
---|---|
spelling |
id-itb.:166902017-09-27T10:40:52ZFMEA IMPLEMENTING OF PLTGU BEKASI POWERÃâÃâS STEAM TURBINE MAINTENANCE RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/16690 Final project is about making FMEA form of steam turbine <br /> <br /> <br /> PLTGU Bekasi Power in order to know the Risk Priority Number in which explain the priority of maintenance task. Traditional maintenance only focus on time based maintenance, it doesn’t care the cause of the failure. This can make the same pattern of failure modes in the other times. With implementing failure mode and effect analysis, we can solve this problem. FMEA prior the maintenance task based on the risk, another adventage of implementing FMEA is we know what should do to the failure. It can makes the maintenance more <br /> <br /> <br /> effective and efficient, so we don’t need to do something useless which sometimes do in traditional maintenance. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Final project is about making FMEA form of steam turbine <br />
<br />
<br />
PLTGU Bekasi Power in order to know the Risk Priority Number in which explain the priority of maintenance task. Traditional maintenance only focus on time based maintenance, it doesn’t care the cause of the failure. This can make the same pattern of failure modes in the other times. With implementing failure mode and effect analysis, we can solve this problem. FMEA prior the maintenance task based on the risk, another adventage of implementing FMEA is we know what should do to the failure. It can makes the maintenance more <br />
<br />
<br />
effective and efficient, so we don’t need to do something useless which sometimes do in traditional maintenance. |
format |
Final Project |
author |
RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO |
spellingShingle |
RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO FMEA IMPLEMENTING OF PLTGU BEKASI POWER̉̉S STEAM TURBINE MAINTENANCE |
author_facet |
RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO |
author_sort |
RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO |
title |
FMEA IMPLEMENTING OF PLTGU BEKASI POWER̉̉S STEAM TURBINE MAINTENANCE |
title_short |
FMEA IMPLEMENTING OF PLTGU BEKASI POWER̉̉S STEAM TURBINE MAINTENANCE |
title_full |
FMEA IMPLEMENTING OF PLTGU BEKASI POWER̉̉S STEAM TURBINE MAINTENANCE |
title_fullStr |
FMEA IMPLEMENTING OF PLTGU BEKASI POWER̉̉S STEAM TURBINE MAINTENANCE |
title_full_unstemmed |
FMEA IMPLEMENTING OF PLTGU BEKASI POWER̉̉S STEAM TURBINE MAINTENANCE |
title_sort |
fmea implementing of pltgu bekasi powerãâãâs steam turbine maintenance |
url |
https://digilib.itb.ac.id/gdl/view/16690 |
_version_ |
1820745435934883840 |