FMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE

Final project is about making FMEA form of steam turbine <br /> <br /> <br /> PLTGU Bekasi Power in order to know the Risk Priority Number in which explain the priority of maintenance task. Traditional maintenance only focus on time based maintenance, it doesn’t care the cause...

Full description

Saved in:
Bibliographic Details
Main Author: RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16690
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:16690
spelling id-itb.:166902017-09-27T10:40:52ZFMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/16690 Final project is about making FMEA form of steam turbine <br /> <br /> <br /> PLTGU Bekasi Power in order to know the Risk Priority Number in which explain the priority of maintenance task. Traditional maintenance only focus on time based maintenance, it doesn’t care the cause of the failure. This can make the same pattern of failure modes in the other times. With implementing failure mode and effect analysis, we can solve this problem. FMEA prior the maintenance task based on the risk, another adventage of implementing FMEA is we know what should do to the failure. It can makes the maintenance more <br /> <br /> <br /> effective and efficient, so we don’t need to do something useless which sometimes do in traditional maintenance. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Final project is about making FMEA form of steam turbine <br /> <br /> <br /> PLTGU Bekasi Power in order to know the Risk Priority Number in which explain the priority of maintenance task. Traditional maintenance only focus on time based maintenance, it doesn’t care the cause of the failure. This can make the same pattern of failure modes in the other times. With implementing failure mode and effect analysis, we can solve this problem. FMEA prior the maintenance task based on the risk, another adventage of implementing FMEA is we know what should do to the failure. It can makes the maintenance more <br /> <br /> <br /> effective and efficient, so we don’t need to do something useless which sometimes do in traditional maintenance.
format Final Project
author RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO
spellingShingle RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO
FMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE
author_facet RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO
author_sort RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO
title FMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE
title_short FMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE
title_full FMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE
title_fullStr FMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE
title_full_unstemmed FMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE
title_sort fmea implementing of pltgu bekasi powerãƒâ€šã‚’s steam turbine maintenance
url https://digilib.itb.ac.id/gdl/view/16690
_version_ 1820745435934883840