FMEA IMPLEMENTING OF PLTGU BEKASI POWER’S STEAM TURBINE MAINTENANCE

Final project is about making FMEA form of steam turbine <br /> <br /> <br /> PLTGU Bekasi Power in order to know the Risk Priority Number in which explain the priority of maintenance task. Traditional maintenance only focus on time based maintenance, it doesn’t care the cause...

Full description

Saved in:
Bibliographic Details
Main Author: RESANDO NAINGGOLAN (NIM : 13106126); Pembimbing : Dr. F.X Sangriyadi Setio; Prof Wiranto Arismu, NICO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16690
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia