MATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA

PT Pembangkitan Jawa Bali Unit Pemabngkit Cirata (PT PJB UP Cirata) is one of the largest hydroelectric power in Indonesia. Efficiency and reliability of units to <br /> <br /> <br /> company success indicators. For that operation and maintenance of generating units that became t...

Full description

Saved in:
Bibliographic Details
Main Author: PRIMAWARTO (NIM : 29107337); Pembimbing: Prof. Togar M. Simatupang, Ir, M. Tech, Phd, RINDA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17022
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17022
spelling id-itb.:170222017-09-27T15:30:56ZMATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA PRIMAWARTO (NIM : 29107337); Pembimbing: Prof. Togar M. Simatupang, Ir, M. Tech, Phd, RINDA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17022 PT Pembangkitan Jawa Bali Unit Pemabngkit Cirata (PT PJB UP Cirata) is one of the largest hydroelectric power in Indonesia. Efficiency and reliability of units to <br /> <br /> <br /> company success indicators. For that operation and maintenance of generating units that became the core business of the company should be run in accordance with a predetermined plan. To support this activity required an effective inventory management and efficient operation and maintenance is not compromised due to lack <br /> <br /> <br /> of supplies in storage. <br /> <br /> <br /> Problems faced by PT PJB UP Cirata is a stock that came too late. This is indicated by the value of service level for the last three years is still below the target set. <br /> <br /> <br /> Unavailability of materials in the warehouse cause the operation and maintenance schedules are not on time and resulted in the opportunity to sell electricity into a little more. In addition there is an increase in value of inventory due to a lack of coordination between sectors. This happens because there are no proper inventory control strategies. <br /> <br /> <br /> To solve this problem, the authors tried to map out the problems that exist in each stream of material management. After that created a diagram to find the root of the problem linkage problem. At least four major problems that exist in the field of materials management is not efficient procurement of consumable materials, not specifically appropriate material control, the status of inventory in the warehouse that does not exist and the lack of coordination among parties involved in the field of materials management. <br /> <br /> <br /> After obtaining the root of the problem, then create alternative solutions for each root of the problem. The best solution is taken based on the analysis of advantages and disadvantages of each alternative solution. The best solution is taken is the provision <br /> <br /> <br /> of consumable materials twice a year, specific material control strategy (consisting of the identification field, VMI and the matrix material), stock opname plus and SCM meetings weekly. To complement these solutions, constructed diagrams inventory control strategies that are comprehensive, effective and efficient to PT PJB UP Cirata. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Pembangkitan Jawa Bali Unit Pemabngkit Cirata (PT PJB UP Cirata) is one of the largest hydroelectric power in Indonesia. Efficiency and reliability of units to <br /> <br /> <br /> company success indicators. For that operation and maintenance of generating units that became the core business of the company should be run in accordance with a predetermined plan. To support this activity required an effective inventory management and efficient operation and maintenance is not compromised due to lack <br /> <br /> <br /> of supplies in storage. <br /> <br /> <br /> Problems faced by PT PJB UP Cirata is a stock that came too late. This is indicated by the value of service level for the last three years is still below the target set. <br /> <br /> <br /> Unavailability of materials in the warehouse cause the operation and maintenance schedules are not on time and resulted in the opportunity to sell electricity into a little more. In addition there is an increase in value of inventory due to a lack of coordination between sectors. This happens because there are no proper inventory control strategies. <br /> <br /> <br /> To solve this problem, the authors tried to map out the problems that exist in each stream of material management. After that created a diagram to find the root of the problem linkage problem. At least four major problems that exist in the field of materials management is not efficient procurement of consumable materials, not specifically appropriate material control, the status of inventory in the warehouse that does not exist and the lack of coordination among parties involved in the field of materials management. <br /> <br /> <br /> After obtaining the root of the problem, then create alternative solutions for each root of the problem. The best solution is taken based on the analysis of advantages and disadvantages of each alternative solution. The best solution is taken is the provision <br /> <br /> <br /> of consumable materials twice a year, specific material control strategy (consisting of the identification field, VMI and the matrix material), stock opname plus and SCM meetings weekly. To complement these solutions, constructed diagrams inventory control strategies that are comprehensive, effective and efficient to PT PJB UP Cirata.
format Theses
author PRIMAWARTO (NIM : 29107337); Pembimbing: Prof. Togar M. Simatupang, Ir, M. Tech, Phd, RINDA
spellingShingle PRIMAWARTO (NIM : 29107337); Pembimbing: Prof. Togar M. Simatupang, Ir, M. Tech, Phd, RINDA
MATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA
author_facet PRIMAWARTO (NIM : 29107337); Pembimbing: Prof. Togar M. Simatupang, Ir, M. Tech, Phd, RINDA
author_sort PRIMAWARTO (NIM : 29107337); Pembimbing: Prof. Togar M. Simatupang, Ir, M. Tech, Phd, RINDA
title MATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA
title_short MATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA
title_full MATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA
title_fullStr MATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA
title_full_unstemmed MATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA
title_sort material management strategy pt pembangkitan jawa bali unit pembangkit cirata
url https://digilib.itb.ac.id/gdl/view/17022
_version_ 1820745513575645184