MATERIAL MANAGEMENT STRATEGY PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKIT CIRATA
PT Pembangkitan Jawa Bali Unit Pemabngkit Cirata (PT PJB UP Cirata) is one of the largest hydroelectric power in Indonesia. Efficiency and reliability of units to <br /> <br /> <br /> company success indicators. For that operation and maintenance of generating units that became t...
Saved in:
Main Author: | PRIMAWARTO (NIM : 29107337); Pembimbing: Prof. Togar M. Simatupang, Ir, M. Tech, Phd, RINDA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17022 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EFISIENSI PEMBANGKIT LISTRIK: STUDI KASUS UNIT PEMBANGKITAN PAITON
by: LAILIA RAHMAWATI, 041411131111
Published: (2018) -
Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton
by: , Harry Purnomo, et al.
Published: (2013) -
ANALISA CHANGE READINESS PADA PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKITAN BRANTAS DALAM PROSES REENGINEERING DAN MODERNISASI PERALATAN
by: LISNA MERY TEODORA, 041214353075
Published: (2017) -
PERUMUSAN STRATEGI KORPORASI BADAN PENGELOLA WADUK CIRATA (BPWC)
by: Setiawan, Wawan -
Evaluasi Keandalan Pembangkit Listrik Tenaga Uap Di PT. PJB Unit Pembangkitan Paiton
by: Perpustakaan UGM, i-lib
Published: (2010)