#TITLE_ALTERNATIVE#
In gas production process, capability of reservoir to deliver gas (gas deliver ability) will decrease as a result of reservoir pressure drop. This may cause the undeliverability of the production target as state in the contract.One of the ways that producer can do is by opening new wells. By opening...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17168 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | In gas production process, capability of reservoir to deliver gas (gas deliver ability) will decrease as a result of reservoir pressure drop. This may cause the undeliverability of the production target as state in the contract.One of the ways that producer can do is by opening new wells. By opening new wells, the capability of reservoir to deliver the gas will increase. The objective of this thesis is to estimate how long reservoir can deliver gas with constant rate and to determine the number of new wells that should be open in order to satisfy the production target. Here heuristic optimization method and concept of multi well gas deliverability are used to solve this problem. Simulation results are done with some hypothetical data. |
---|