#TITLE_ALTERNATIVE#
In gas production process, capability of reservoir to deliver gas (gas deliver ability) will decrease as a result of reservoir pressure drop. This may cause the undeliverability of the production target as state in the contract.One of the ways that producer can do is by opening new wells. By opening...
Saved in:
Main Author: | SARI UTAMI (NIM : 10107058) Pembimbing : Prof. Dr. Edy Soewono; Prof. Dr. Ir. Pudjo Soekarno, SARAH |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17168 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: SARI UTAMI (NIM 10107058); Pembimbing : Prof. Dr. Edy Soewono, SARAH -
#TITLE_ALTERNATIVE#
by: PRATAMA PUTRA MR (NIM : 10107068); Pembimbing : Prof. Dr. Edy Soewono Prof. Dr. Ir. Pudjo Soe, INDRA -
#TITLE_ALTERNATIVE#
by: PRATAMA PUTRA MR (NIM 10107068); Pembimbing : Prof. Dr. Edy Soewono dan Prof. Dr. Ir. Pudjo So, INDRA -
#TITLE_ALTERNATIVE#
by: INDAH (NIM 10107083); Pembimbing : Prof. Dr. Edy Soewono, NADIA -
#TITLE_ALTERNATIVE#
by: CHOUVANI (NIM 10107021); Pembimbing : Prof. Dr. Edy Soewono, JESSICA