#TITLE_ALTERNATIVE#

In gas production process, capability of reservoir to deliver gas (gas deliver ability) will decrease as a result of reservoir pressure drop. This may cause the undeliverability of the production target as state in the contract.One of the ways that producer can do is by opening new wells. By opening...

Full description

Saved in:
Bibliographic Details
Main Author: SARI UTAMI (NIM : 10107058) Pembimbing : Prof. Dr. Edy Soewono; Prof. Dr. Ir. Pudjo Soekarno, SARAH
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17168
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17168
spelling id-itb.:171682017-09-27T11:43:11Z#TITLE_ALTERNATIVE# SARI UTAMI (NIM : 10107058) Pembimbing : Prof. Dr. Edy Soewono; Prof. Dr. Ir. Pudjo Soekarno, SARAH Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17168 In gas production process, capability of reservoir to deliver gas (gas deliver ability) will decrease as a result of reservoir pressure drop. This may cause the undeliverability of the production target as state in the contract.One of the ways that producer can do is by opening new wells. By opening new wells, the capability of reservoir to deliver the gas will increase. The objective of this thesis is to estimate how long reservoir can deliver gas with constant rate and to determine the number of new wells that should be open in order to satisfy the production target. Here heuristic optimization method and concept of multi well gas deliverability are used to solve this problem. Simulation results are done with some hypothetical data. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In gas production process, capability of reservoir to deliver gas (gas deliver ability) will decrease as a result of reservoir pressure drop. This may cause the undeliverability of the production target as state in the contract.One of the ways that producer can do is by opening new wells. By opening new wells, the capability of reservoir to deliver the gas will increase. The objective of this thesis is to estimate how long reservoir can deliver gas with constant rate and to determine the number of new wells that should be open in order to satisfy the production target. Here heuristic optimization method and concept of multi well gas deliverability are used to solve this problem. Simulation results are done with some hypothetical data.
format Final Project
author SARI UTAMI (NIM : 10107058) Pembimbing : Prof. Dr. Edy Soewono; Prof. Dr. Ir. Pudjo Soekarno, SARAH
spellingShingle SARI UTAMI (NIM : 10107058) Pembimbing : Prof. Dr. Edy Soewono; Prof. Dr. Ir. Pudjo Soekarno, SARAH
#TITLE_ALTERNATIVE#
author_facet SARI UTAMI (NIM : 10107058) Pembimbing : Prof. Dr. Edy Soewono; Prof. Dr. Ir. Pudjo Soekarno, SARAH
author_sort SARI UTAMI (NIM : 10107058) Pembimbing : Prof. Dr. Edy Soewono; Prof. Dr. Ir. Pudjo Soekarno, SARAH
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/17168
_version_ 1820745547935383552