RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT

Maple Park Apartment project was one of the project won by PT Jaya Abadi Utama trough tender process. The project was planned finished within 1 (one) year and spent cost around 12 (twelve) Billions Rupiah. However the project did not work as planned before. So the project became ineffective and inef...

Full description

Saved in:
Bibliographic Details
Main Author: NARULITA (NIM : 29106423); Pembimbing: Ir. Rudy Bekti, MM, TITA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/17416
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:17416
spelling id-itb.:174162017-09-27T15:30:48ZRECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT NARULITA (NIM : 29106423); Pembimbing: Ir. Rudy Bekti, MM, TITA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/17416 Maple Park Apartment project was one of the project won by PT Jaya Abadi Utama trough tender process. The project was planned finished within 1 (one) year and spent cost around 12 (twelve) Billions Rupiah. However the project did not work as planned before. So the project became ineffective and inefficient. <br /> <br /> <br /> There are 2 (two) core problems in Maple Park apartement project, such as : <br /> <br /> <br /> (1) Working process for running the project did not reach the final targets base on triple constraints (scope, time, cost). <br /> <br /> <br /> (2) The weakness of the project controlling process. <br /> <br /> <br /> This final assignment is made to solve the problem of Maple Park apartement project through the application of project manajement. <br /> <br /> <br /> The focus of this final assignment is analizing project design system of Maple Park apartment. Finally 2 (two) analysis methods are recommended to solve the problems <br /> <br /> <br /> of Maple Park apartement project, which are : <br /> <br /> <br /> 1. Analytic Hierarchy Process method is use to choose priority recommendations for solving project working process. <br /> <br /> <br /> 2. Mc Kinsey frame work for stronger project controlling process. <br /> <br /> <br /> There are some priority actions after doing the analyses. Plan-Do-Check-Action (PDCA) cycle is used to implement the action resulted from analyses method. Through PDCA cycle we can view the schedule of each action’s implementation. Afterward human and financial resources will be needed to apply the actions. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Maple Park Apartment project was one of the project won by PT Jaya Abadi Utama trough tender process. The project was planned finished within 1 (one) year and spent cost around 12 (twelve) Billions Rupiah. However the project did not work as planned before. So the project became ineffective and inefficient. <br /> <br /> <br /> There are 2 (two) core problems in Maple Park apartement project, such as : <br /> <br /> <br /> (1) Working process for running the project did not reach the final targets base on triple constraints (scope, time, cost). <br /> <br /> <br /> (2) The weakness of the project controlling process. <br /> <br /> <br /> This final assignment is made to solve the problem of Maple Park apartement project through the application of project manajement. <br /> <br /> <br /> The focus of this final assignment is analizing project design system of Maple Park apartment. Finally 2 (two) analysis methods are recommended to solve the problems <br /> <br /> <br /> of Maple Park apartement project, which are : <br /> <br /> <br /> 1. Analytic Hierarchy Process method is use to choose priority recommendations for solving project working process. <br /> <br /> <br /> 2. Mc Kinsey frame work for stronger project controlling process. <br /> <br /> <br /> There are some priority actions after doing the analyses. Plan-Do-Check-Action (PDCA) cycle is used to implement the action resulted from analyses method. Through PDCA cycle we can view the schedule of each action’s implementation. Afterward human and financial resources will be needed to apply the actions.
format Theses
author NARULITA (NIM : 29106423); Pembimbing: Ir. Rudy Bekti, MM, TITA
spellingShingle NARULITA (NIM : 29106423); Pembimbing: Ir. Rudy Bekti, MM, TITA
RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT
author_facet NARULITA (NIM : 29106423); Pembimbing: Ir. Rudy Bekti, MM, TITA
author_sort NARULITA (NIM : 29106423); Pembimbing: Ir. Rudy Bekti, MM, TITA
title RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT
title_short RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT
title_full RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT
title_fullStr RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT
title_full_unstemmed RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT
title_sort recommendations for effectively completing project maple park apartment
url https://digilib.itb.ac.id/gdl/view/17416
_version_ 1820745600035979264