RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT
Maple Park Apartment project was one of the project won by PT Jaya Abadi Utama trough tender process. The project was planned finished within 1 (one) year and spent cost around 12 (twelve) Billions Rupiah. However the project did not work as planned before. So the project became ineffective and inef...
Saved in:
Main Author: | NARULITA (NIM : 29106423); Pembimbing: Ir. Rudy Bekti, MM, TITA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17416 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROJECT PROPOSAL ZERO VENTING FOR KOTABATAK OIL FIELD
by: JANUARDI (NIM : 29107081); Pembimbing: Ir. Rudy Bekti, MM, EKO -
OPERATIONAL RISK MANAGEMENT AT CRUSHER MASTER PLAN PROJECT PT FREEPORT INDONESIA
by: NUGROHO (NIM : 29107127); Pembimbing: Ir. RUDY BEKTI, MM, SETIA -
THE APLICATION OF PROJECT PERFORMANCE MEASUREMENT AND MONITORING SYSTEM BY USING EARNED VALUE AND PERFORMANCE DASHBOARD CONCEPT
by: VESAL HAKIM (NIM: 29107138); Pembimbing: Ir. Rudy Bekti, MM, RADEN -
EVALUATION ON PLANNING AND CONTROLLING PINANG ̉̉ PAGER GAS TRANSMISSION LINE REPLACEMENT PROJECT IN PT. CHEVRON PACIFIC INDONESIA
by: ZAINUDDIN (NIM : 29106380); Pembimbing: Ir. Rudy Bekti, MM , AHMAD -
Plasma amino acid analyses in two cases of maple syrup urine disease
by: Rudee Surarit, et al.
Published: (2018)