#TITLE_ALTERNATIVE#
High performance of substation reliability is important on Power System operation. To observe substation reliability is needed parameter record of indicator which shown by substation component and outage record. Implementation Management of Information System for Substation Operation which base .NET...
Saved in:
Main Author: | PAMUNGKAS (NIM 13201048); Pembimbing: Ir. Nanang Haryanto MT., WAHYU |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17523 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: SEPTAVYN (NIM : 13205124); Pembimbing : Dr. Ir. Muhammad Nurdin ; Dr.Ir.Nanang Haryanto, MT., ROBIN -
#TITLE_ALTERNATIVE#
by: FADHLI (NIM 13205097); Pembimbing: Dr. Ir. Muhammad Nurdin dan Dr.Ir.Nanang Haryanto, MT., FUAD -
#TITLE_ALTERNATIVE#
by: ABDUL MATIN (NIM 13205160); Pembimbing: Dr. Ir. Muhammad Nurdin dan Ir.Nanang Haryanto, MT., TOTOH -
#TITLE_ALTERNATIVE#
by: ARDIYANTO (NIM : 13205189); Pembimbing : Dr.Ir. Muhammad Nurdin; Dr. Ir. Nanang Haryanto, TRI -
#TITLE_ALTERNATIVE#
by: RIZKI WARDANA (NIM : 13205178); Pembimbing : Dr.Ir. Muhammad Nurdin; Dr.Ir. Nanang Haryanto, FELA